Started on the preparation for the concrete and insulation of the storage shed. I cleaned it out and dad buried 2 floor drains. Will have 3” of pitch in 25’ to each of the drains.
I need to run wire to our 6 20 amp each outlets on the south wall. I figure I can park 6 dump trucks in here at a angle. That way they can come out one at a time.
I’m gonna try 3” of spray foam on the walls and ceiling just for the fact it will be done in a day or two and won’t need tin work. That will be a someday project. It will also seal up some of the small holes in the tin on the south and west end that happened when the tornado came through and wrecked all my shit across the road.