woods
I probably did it wrong.
- Joined
- May 22, 2020
- Member Number
- 1120
- Messages
- 5,165
I'm just going to wait for plywood to come down I think. I don't see the HVAC thing going until next year anyways. I'll bring up some planks if lumber is still stupid.or just take two boards up there and crawl on one while dragging the other to the front
expect nail pops in the ceiling below because you're gonna be compacting the insulation up there pretty bad
if there's enough headroom and your knees will let you squat in there, just walk on the joists/bc/whatever
You lost me on the nail pops. I'm not going to be compacting the insulation. The plywood is going to be on the joists. Just so I can walk. Only half a sheet wide for a path. The insulation is in-between the joists so it won't be affected.
I have to crouch, and I can't squat because of the knee replacements. I can kneel, buts its freaking miserable. I just scoot around on my ass.