smells things
so anyways, that covers a couple months of getting very little done
ground thawed so I'm gonna start digging out from under the wall I've been working along. Thinking I'll be replacing the whole thing with concrete. Got snap ties and 3/4 plywood to make forms with, figuring on a 10" wall below grade, 6" above the floor. Gonna try doing a suspended slab using old garage doors as the decking material. Figure I can put as much cribbing underneath it as I need to. footing so far I figure will be something like 8" thick and 24" wide.
Just doing all these figurings seat of the pants like, anyone that knows concrete feel free and hop in with suggestions.
ground thawed so I'm gonna start digging out from under the wall I've been working along. Thinking I'll be replacing the whole thing with concrete. Got snap ties and 3/4 plywood to make forms with, figuring on a 10" wall below grade, 6" above the floor. Gonna try doing a suspended slab using old garage doors as the decking material. Figure I can put as much cribbing underneath it as I need to. footing so far I figure will be something like 8" thick and 24" wide.
Just doing all these figurings seat of the pants like, anyone that knows concrete feel free and hop in with suggestions.