Getting any real real shop time in has been a struggle outside of maintaining transportation. That said, I’ve been trying to do something productive on this project every time I go into the shop, although that doesn’t make for much of an update most of the time.
Tailwheel rudder cables needed an extra hole in the belly skin. Managed to get those cut out and a layer of primer down inside the tail. I don’t know how I’m gonna buck these rivets going back on. I need to find a small helper.
While the paint was drying I decided to blast the landing gear legs I bought. I also managed to straighten out the bent gear to where it matches quite well. I have some measurements from Cessna that I still need to verify. Took a little more than 30 tons to straighten out the leg.
Unfortunately, the blasting revealed more/deeper pitting than I had in mind. So I think they’re intolerance to blend out though, but this is gonna be a big job. The SRM will also require a peened surface when done.
I think there has to be a method to weld up pits in Spring steel, and then have them re-heat treated. Internets coming quite short on answers for that though outside of don’t weld springs.