gunracer1
Collector of fine junk
Well i have had the trenched 4’ deep and 8”s wide since thanksgiving. I poured 3 pallets of concrete in the trench to get it about 6” below ground level. Then i framed up the forms for the beam. Last soring i was about to pour and i fawked my back up. I was a cripple for over a month, damn near bed ridden. About the time i get over that im getting ready for a week in Colorado. Them it turns hotter than Hades. Well we got a bit of a break this week. So i called Jai Bird and Butterbean for a mixing party this morning.