So I've been living with a small 1 car garage that neither the wife or I are able to park in.....too much stuff and not really much room in it. After all it's just an enclosed carport.

We bought the house knowing I wanted to build a slightly oversized 2 car in the back. The process has finally begun.

Since I live in a suburb with 60's tri-levels and smaller than 1/4 acre lots, I can't go crazy...nor am I a fabricator or major "builder" so take that into consideration. I'm open to suggestions as to things to incorporate...but the structure has been decided and started.

Size was originally going to be a 24x 28...but after i laid it out decided to go to 24x26. The other specs decided on already. 18'x8' garage door with top row windows, storage attic trusses, vinyl siding with brick wainscoting on wing walls and 1 long side that's visible. 2 3'x4' windows on one side, and 9 light 36" man door. Belt drive opener. I changed to 26' because the house will be added on to in the future and at 28' it just got too close for my tastes.

I received a quote last summer to do the job 100%. This included excavating the back corner and adding a 110' of retaining wall (2-3' for 75' then 4-6' for other 35') as well as converting the single csr back into a pull thru carport and removing a 40' tall weed tree. The bid came in at $70k. I thought no way.

I started earlier this spring when shit started going downhill. I started by cutting down the tree. With help from some neighbors I took my time and played daredevil climbing on a ladder on my roof and got it down without any damage

20200322_160743.jpg


20200322_161202.jpg
 
After I got the tree cut down I had a friend of my Father-in-law come over and start excavating the hill, tear out the stump and dig for the wall. He also cut me a deal on gravel and setting the wall.

Before looking along the garage towards backyard.

20200314_190720.jpg


20200407_174238.jpg


20200406_114018.jpg


20200408_174333.jpg


20200409_191612.jpg
 
Here is the wall as it is complete. I had to borrow a skidsteer to remove a bunch of dirt that was removed. It took 5 dump trailers worth.

20200426_193451.jpg


20200426_193421.jpg


20200426_193445.jpg
 
I finally decided I didn't have time or patience to frame it out or deal with managing subs so got a few bids on just building the garage and I could do some of the work and help. Finally found a guy.l that was priced reasonable and had a good rep. We went back and forth for a month or so on schedule and details/specs. I wanted to get the final layout in the yard so I squared it off the back property line and found my setbacks. This is where I decided to shrink back to 26' . They finally started digging the footings yesterday and got them poured. They will be back Monday to do the walls. This is where it sits now.

20200706_195724.jpg


20200707_190224.jpg
 
It's been awhile since I updated this.....not that it is anything special since it"m's a typical garage....but it's finally built a d the permit closed. I still need to rip out the enclosed carport and pour the remainder of the driveway....but once the epoxy is laid next week I can start moving things unto it.

I did sheet in the attic storage while I was waiting f
for the power to be handled. We had a very rare hurricane force windstorm here at the beginning of Sept and that pushed getting the power and final sign off by over a month.

Here are some progress pics

20200731_134926.jpg
20200730_194506.jpg

20200826_124959.jpg
20200903_175027.jpg

20200926_125227.jpg
 
It's been awhile since I updated this. The epoxy/polyaspartic was put down right before Halloween. There was some bad off gassing that caused bubbles and the company was behind over a day due to issues with trailer as well as freezing temps...and they didn't address them...so I had craters throughout the floor. The company was great to work with and said they would redo it...but it would be 3 weeks. This delayed moving all the stuff from the single garage to this and gave me a chance to do insulation and drywall. I also had the gas line ran in the wall for the overhead heater.

They came right before Thanksgiving and finished it. I finished up wiring and drywall and painted after it was done. I am now getting cabinets and work bench placed before I start with the outside final grade and garage tear out.

The garage itself is now complete minus the work bench, shelving, heater and final lighting. Click image for larger version Name:	20201103_193507.jpg Views:	0 Size:	315.2 KB ID:	220053 Click image for larger version Name:	20201108_125627.jpg Views:	0 Size:	177.2 KB ID:	220054 Click image for larger version Name:	20201121_134812.jpg Views:	0 Size:	205.5 KB ID:	220055 Click image for larger version Name:	20201201_195842.jpg Views:	0 Size:	163.2 KB ID:	220056 Click image for larger version Name:	20201201_195822.jpg Views:	0 Size:	174.0 KB ID:	220057
 
image_35381.jpg
More...and some pics of the craters from the first attempt at the epoxy
20201201_195830.jpg 20201201_195847.jpg