We had a 992D that had 85,000 frame hours when that sent to Boyd for major rebuild.What's considered to be very high hours in that kind of machine?
We had a 992D that had 85,000 frame hours when that sent to Boyd for major rebuild.What's considered to be very high hours in that kind of machine?
Yes, pretty much. If they wasnt broke down they was running.damn, how many years to get 85k frame hours on these machines? running 3 shifts in a mine or something where it's only shut off to refuel and do PMs?
lol it doesn’t take long. I have multiple pieces above 20,000 one above 30,000 one above 40,000hrs.damn, how many years to get 85k frame hours on these machines? running 3 shifts in a mine or something where it's only shut off to refuel and do PMs?
Sorry for the double post, thats the location
I 24,500 in 988H in 13 yearslol it doesn’t take long. I have multiple pieces above 20,000 one above 30,000 one above 40,000hrs.
I love the internet.Its fixed and in a heidelburg quarry in Ohio now, this happened in Indiana. Id had over 60,000 frame hours when this happened. I ran this machine for a little bit.
IT was down with broken bucket when we took it over, was almost a month of waiting on that repair, that was in Feb, i quit working there in Aug. This happened 3 years after I left.I love the internet.
If this was between 1990 and 2005, very likely.The IBB: I read about a whore in TJ that had her rectum ripped open.
Also the IBB: I tore that bitch a new asshole in 2019. * pics *
Temu.
I thought I found some inexpensive Loctite.
what say the yellow iron experts? Panz and Carter can that be fixed or just scrap it? I am sure it can be fixed but would the repair cost outweigh value of machine?
The Panz guy would rebuild it in an afternoonPerhaps naive, but seems like it really isn't too bad in the grand scheme of things. Some heavy structural work to restore the upper pivot, line bore pivot, probably some work on lower pivot, new pins and steering rams and maybe new hoses depending on how badly they stretched. Not trivial, but doesn't seem like all that difficult or costly of a repair to me.
Net weight: 10 mL
They are built to smash shit at 50mph when they are in use.Those plows just dont have much give
My frame has over 400,000 hours. It took around 55 years.damn, how many years to get 85k frame hours on these machines? running 3 shifts in a mine or something where it's only shut off to refuel and do PMs?
400,000/55=7,272.72 hours per yearMy frame has over 400,000 hours. It took around 55 years.
It's my human frame. It doesn't get any time off.400,000/55=7,272.72 hours per year
one year = 8,760 hours
meaning, it only have roughly 1,488 hours off per year or approx 2 full months time off with 10 months on duty continuously 24/7 per year.
Wtf? Desantis and Trump both missing from the list but there’s a couple of names I never heard of.my Nev mail in ballet that I did not ask for...